|
A turnkey project involving the
construction of a structural steel bunker, specifically
designed and constructed to be used by Aramco
as a warehouse to store hazardous material.
The building was equipped with
sophisticated security and fire control equipment,
utilizing chemicals capable of extinguishing fires
in less than three minutes.
Construction period : 12 months
|